The design, construction and operation of 2010 cleanup actions in Skykomish are described in the 2010 Engineering Design Report (EDR). The report includes information about construction activities, building relocation and traffic impacts.
2010 cleanup activities included temporarily relocating buildings; excavating contaminated soils on BNSF, Town, and residential properties; restoring properties and connecting them to infrastructure for the community wastewater system; cleaning up and restoring Former Maloney Creek wetlands; and excavating contaminated soils near the 5th Street bridge abutment. Click on the maps below to learn more about cleanup accomplishments in 2010.
Formal cleanup documents, weekly reports, and newsletters that were produced during 2010 cleanup activities are available in the Documents section.